“"Change Order #4 for the Henderson kitchen remodel. Description: client requested upgrade from the originally-specified medium-density fiberboard cabinet boxes to plywood boxes throughout the kitchen, including the pantry and the island. — Scope: 22 cabinet boxes total — 14 wall and base in the kitchen proper, 6 in the pantry, 2 in the island. Plywood spec: ¾-inch maple ply with hardwood edge banding, equivalent to the same vendor's premium tier. — Schedule impact: cabinet vendor confirms a 12-business-day lead time on the upgraded boxes versus the original 8-day lead. This pushes the cabinet-installation start from June 18 to June 26. The downstream impact on the project timeline: countertop template moves from June 22 to June 30, countertop installation from July 5 to July 13, final walkthrough from July 12 to July 20. — Cost impact: cabinet-box upgrade is a $4,260 increase from the original spec ($1,840 in materials, $620 in additional finishing labor for the visible exposed plywood edges that the original MDF spec didn't need, plus $1,800 contingency-line draw for the schedule disruption to the trim sub). — Client signature on this change order required before we issue the cabinet PO. Sent to the client this afternoon for review."”
- · 270-word change order dictated in a single ~95-second hold
- · Material specs, dimensions, dollar amounts, dates all preserved verbatim
- · Scope, schedule impact, and cost impact structure carried through naturally
- · Voice version: ~95 seconds; typed version at the kitchen table after dinner would have been 15-25 minutes